A proposito del progetto
Air extraction system consisting of our traditional ventilated ceiling, completely made of AISI304 stainless steel, with all-external hot/cold air reintegration and LED lighting, installed at the Feudi di San Gregorio company located in the municipality of Sorbo Serpico (AV)
Panoramica del progetto
Ventilated ceiling 68 m2; Extraction air volume 10,000 m3/h Inlet air volume 9,000 m3/h Lighting with recessed LED lights IP65