A proposito del progetto
Complete extraction ventilated ceiling, with treated air replenishment, for the winter season, in collaboration with G.Guidomei (RN). Before, during and after installing the suction ceiling.
Panoramica del progetto
Traditional ventilated ceiling 30 m2, extraction air volume 7000 m3/h, intake treated air volume 6000 m3/h. With neon light and thermoregulations.