A proposito del progetto
A major project for the New Hotel Palazzo Tirso, housed within the historic palazzo of the same name, an authentic architectural jewel dating back to the 1920s.
This project directly involved us in the study and realisation of the extraction systems of the three kitchens planned inside this new and refined 5-star hotel in the centre of Cagliari.
Particular attention was paid to our special shaped hood, model Hurricane High Containment Effiiciency, custom-designed and built and the undisputed star of the Show Cooking Hall area located on the first floor of Palazzo Tirso.
Panoramica del progetto
- UBasement:
Exhaust Air Volume 12.000 mc/h
Fresh Air Immission Volume 11.500 mc/h
- Ground Floor:
Exhaust Air Volume 7.500 mc/h
Fresh Air Immission Volume 7.000 mc/H
- Rooftop:
Exhaust Air Volume 6.500 mc/h
Fresh Air Immission Volume 6.000 mc/h